01
File review
Submit CAD, STL, 3DM, OBJ, STEP, or a production packet. Vectrix reviews geometry, timing, quantity, and intended workflow.
Loading production lane
Process
Every job moves through a controlled sequence so production decisions are made before the work enters the printer queue.
Operating principle
Professional files, reviewed by a human production desk, routed into the correct workflow before pricing or timing is promised.
01
Submit CAD, STL, 3DM, OBJ, STEP, or a production packet. Vectrix reviews geometry, timing, quantity, and intended workflow.
02
Orientation, support strategy, resin path, and queue fit are set before the job is approved.
03
Patterns are produced with controlled handling, visible inspection, and job notes for downstream use.
04
Approved work is packed with the job reference, file context, and handoff notes needed by the next team.
Production intake
Vectrix reviews the geometry, timing, quantity, and partner context before quoting. No fake instant pricing, no consumer checkout.