01
Review note
Preferred formats
Submit STL, 3DM, OBJ, STEP, or STP. ZIP packets are useful when a job includes multiple components or reference notes.
Loading production lane
File Requirements
The fastest review path starts with clear units, usable geometry, and production context. File requirements exist to reduce rework and protect the downstream workflow.
Operating principle
Professional files, reviewed by a human production desk, routed into the correct workflow before pricing or timing is promised.
01
Review note
Submit STL, 3DM, OBJ, STEP, or STP. ZIP packets are useful when a job includes multiple components or reference notes.
02
Review note
Include quantity, units, deadline, critical dimensions, intended metal or casting path, and any known support or surface constraints.
03
Review note
Unclear units, non-manifold geometry, missing scale references, and unsupported ultra-thin details slow review and may require revision before quoting.
Production intake
Vectrix reviews the geometry, timing, quantity, and partner context before quoting. No fake instant pricing, no consumer checkout.